Ice Cream Tunnel
Length(s)(Text) | 1567 metres | ||||||||
|---|---|---|---|---|---|---|---|---|---|
Opening to Service | 13 March 2024 | ||||||||
Construction Start | 2016 | ||||||||
Location | Sivas-Malatya Road between Ulaş and Kangal Districts | ||||||||
The Yağdonduran Pass, a key transit point between Sivas and Malatya provinces, posed a major problem for drivers, especially during winter months, due to severe adverse weather conditions including heavy snow precipitation, icing, and snowstorms that caused significant disruptions to transportation. To address this issue, construction of the Yağdonduran Tunnel began in 2016 and it was opened to service in 2024. The 1567-meter-long twin-tube tunnel has been designed to provide drivers with a safer, more comfortable and fast passage, to offer as intended.
The Yağdonduran Tunnel is equipped with Turkey’s first remotely controlled fire fire suppression system. The JET NOZUL fire suppression system automatically activates in the event of any fire. The tunnel is also under 24/7 surveillance through advanced camera monitoring systems.
In addition:
According to the Ministry of Transport and Infrastructure, the opening of the Yağdonduran Tunnel has resulted in together:
The Yağdonduran Tunnel ensures uninterrupted connectivity between Sivas and Malatya, directly supporting economic activities in the region. Drivers engaged in load and passenger transport, who previously faced severe difficulties during winter months, can now travel with greater safety. With the tunnel’s opening:
With its infrastructure, safety measures, and economic advantages, the Yağdonduran Tunnel has become one of Türkiye’s critical tunnel projects. The closure of the previously impassable Yağdonduran Pass during winter months, now replaced by the tunnel, has made the Sivas-Malatya highway safer, faster and more comfortable. Time, the project also draws attention for its environmental benefits alongside its fuel and cost advantages.
"Service-Opened Ice Tunnel Will Save Time and Fuel." Anadolu Ajansı, Accessed March 18, 2025. https://www.aa.com.tr/tr/gundem/hizmete-acilan-yagdonduran-tuneli-zaman-ve-yakit-tasarrufu-saglayacak-/3076675.
"Sivas - Ulaş - Yağdonduran Tüneli." SETİSAN, Accessed March 18, 2025. http://setisan.com/devam-eden-projeler.
"Yağdonduran Geçidi Tarih Oldu." Ulaştırma ve Altyapı Bakanlığı, Accessed March 18, 2025. https://sgb.uab.gov.tr/haberler.
"Yağdonduran Tüneli Açıldı." T.C. Sivas Valiliği, Accessed March 18, 2025. http://www.sivas.gov.tr/yagdonduran-tuneli-acildi.
"Yağdonduran Tüneli Proje Detayları." Karayolları Genel Müdürlüğü, Accessed March 18, 2025. https://www.kgm.gov.tr/Sayfalar/KGM/SiteTr/Projeler/ProjelerDetay.aspx?q=109.
"Yağdonduran Tüneli, Sürücülerin Kış Kabusunu Bitirdi - Sivas Haberleri." Demirören Haber Ajansı, Accessed March 18, 2025. https://www.dha.com.tr/gundem/yagdonduran-tuneli-suruculerin-kis-kabusunu-bitirdi-2400630.
Anadolu Ajansı. "Sivas’ta Yapımı Tamamlanan Yağdonduran Tüneli Hizmete Açıldı." Accessed March 18, 2025. https://www.aa.com.tr/tr/gundem/sivasta-yapimi-tamamlanan-yagdonduran-tuneli-hizmete-acildi/3076303.
Ice Cream Tunnel
Length(s)(Text) | 1567 metres | ||||||||
|---|---|---|---|---|---|---|---|---|---|
Opening to Service | 13 March 2024 | ||||||||
Construction Start | 2016 | ||||||||
Location | Sivas-Malatya Road between Ulaş and Kangal Districts | ||||||||
Project Details
Technological and Safety Features
Economic and Environmental Contributions
Regional Impacts