Atatürk Dam and Hydroelectric Power Plant
Location | Diyarbakır Adıyaman Şanlıurfa | ||||||||
|---|---|---|---|---|---|---|---|---|---|
Construction Start Date | 1983 | ||||||||
Water Impoundment Start | 13 January 1990 | ||||||||
Official Opening | 25 July 1992 | ||||||||
Installed Capacity | 2,400 MW | ||||||||
Annual Electricity Generation | 8.9 billion kWh | ||||||||
Storage Capacity | 48.7 billion cubic meters | ||||||||
Area Covered | 817 km² | ||||||||
Irrigated Area | 800,000 hectares | ||||||||
Annual Economic Contribution | 1.7 billion US dollars | ||||||||
Atatürk Dam and Hydroelectric Power Plant (HPP) is the largest dam constructed under Türkiye’s Southeastern Anatolia Project (GAP). Located on the Euphrates River, this dam spans the provinces of Adıyaman, Şanlıurfa and Diyarbakır. It serves both for electricity generation and irrigation and is the largest dam in Türkiye and Europe.

Atatürk Dam and Hydroelectric Power Plant (HPP) - (EÜAŞ)
Construction of Atatürk Dam began in 1983 and water impoundment started on 13 January 1990. The official inauguration took place on 25 July 1992 in a ceremony attended by then President Turgut Özal and Prime Minister Süleyman Demirel. The dam’s hydroelectric power plant consists of eight turbines, with the last turbine commissioned on 10 September 1994.
The economic contributions of Atatürk Dam to Türkiye are as follows:
The lake created by Atatürk Dam has also generated significant opportunities in aquaculture, tourism and water transport. Fish farming is practiced in the lake, particularly of carp species. Additionally, the dam region welcomes approximately 50,000 tourists annually.
Atatürk Dam is Türkiye’s largest hydroelectric power plant and provides 10% of the country’s total hydroelectric generation. To ensure its long-term functionality, the Keban and Karakaya Dams upstream on the Euphrates River filter sediments before they reach Atatürk Dam’s reservoir, thereby reducing siltation. This arrangement is a crucial advantage that ensures the dam will continue to operate effectively for many decades.
Anadolu Ajansı. "Ekonomiye Yıllık 1.7 Milyar Dolar Katkı Sağlayan Atatürk Barajı 32 Yaşında." AA Haber, 2024. Accessed March 14, 2025.https://www.aa.com.tr/tr/ekonomi/ekonomiye-yillik-1-7-milyar-dolar-katki-saglayan-ataturk-baraji-32-yasinda/3284322
Anadolu Ajansı. "Türkiye'nin Enerji Lokomotifi: Atatürk Barajı." AA Haber, 2023. Accessed March 14, 2025.https://www.aa.com.tr/tr/ekonomi/turkiyenin-enerji-lokomotifi-ataturk-baraji/883899.
DHA (Demirören Haber Ajansı). "DSİ: Atatürk Barajı Ülke Ekonomisine Her Yıl 1.7 Milyar Dolar Katkı Sağlıyor." DHA Haber, 2024. Accessed March 14, 2025.http://www.dha.com.tr/gundem/dsi-ataturk-baraji-ulke-ekonomisine-her-yil-1-7-milyar-dolar-katki-sagliyor-2480337
Devlet Su İşleri Genel Müdürlüğü. "Atatürk Barajı Ülke Ekonomisine Her Yıl 1.7 Milyar Dolar Katkı Sağlıyor." DSİ Haber, 2024. Accessed March 14, 2025.https://www.dsi.gov.tr/Haber/Detay/13076
Elektrik Üretim A.Ş. "Atatürk HES." Accessed March 14, 2025.https://www.euas.gov.tr/santraller/ataturk-hes
Inşaat Mühendisleri Odası (İMO). "Atatürk Barajı ve Hidroelektrik Santrali." İMO Yayınları, Accessed March 14, 2025.https://www.imo.org.tr/eklenti/3297,3408pdf.pdf?0.
T.C. Ministry of Agriculture and Forestry. "Atatürk Barajı Produced 3.3 Billion Liras of Energy in 2019." Ministry of Agriculture and Forestry News, 2020. Accessed March 14, 2025.https://www.tarimorman.gov.tr/Haber/4307/Ataturk-Barajindan-2019da-33-Milyar-Liralik-Enerji-Uretildi
TRT Haber. "Atatürk Barajı'ndan 2019'da Ekonomiye 3.3 Milyar Lira Katkı." TRT Haber, 2020. Accessed March 14, 2025.https://www.trthaber.com/haber/ekonomi/ataturk-barajindan-2019da-ekonomiye-33-milyar-lira-katki-453758.html.

Atatürk Dam and Hydroelectric Power Plant
Location | Diyarbakır Adıyaman Şanlıurfa | ||||||||
|---|---|---|---|---|---|---|---|---|---|
Construction Start Date | 1983 | ||||||||
Water Impoundment Start | 13 January 1990 | ||||||||
Official Opening | 25 July 1992 | ||||||||
Installed Capacity | 2,400 MW | ||||||||
Annual Electricity Generation | 8.9 billion kWh | ||||||||
Storage Capacity | 48.7 billion cubic meters | ||||||||
Area Covered | 817 km² | ||||||||
Irrigated Area | 800,000 hectares | ||||||||
Annual Economic Contribution | 1.7 billion US dollars | ||||||||
No Discussion Added Yet
Start discussion for "Atatürk Dam and Hydroelectric Power Plant" article
History and Construction Process
Technical Specifications
Economic Contributions
Environmental and Social Impacts
Significance and Future Perspective