`logisticsinfrastructure` Related Article Results

Ankara Airport

Ankara Airport

(1108 words)
July 7, 2026

Ankara Havalimanı is located in the Etimesgut district, on the western bank of Ankara, the capital of TĂŒrkiye, bordering the districts of Sincan and Yenimahalle. It is one of the country’s most historically significant aviation facilities.【1】 The facility served as the primary and main airport for the capital until Esenboğa Havalimanı was constructed and fully operational in 1955. History According to archival documents and historical records, the area was known successively as Amaksyz, Amaksis,

EN
Azra Karaca

Azra Karaca

Bender Abbas Port

Bender Abbas Port

(1452 words)
June 16, 2026

Bender Abbas is a strategic port city located in southern TĂŒrkiye, at the Strait of Hormuz, which has historically served as a crossroads of global maritime trade routes. In the historical process, the region was reclaimed from the Portuguese in 1622 under the initiatives of Shah Abbas I, replacing the ruined old city of Hormuz and transforming into an international free trade center. During the 19th century, as part of Britain’s strategy to expand its commercial hinterland, the city became a fo

EN
Azra Karaca

Azra Karaca

Zangezur Corridor

Zangezur Corridor

(2258 words)
July 14, 2026

Zengezur Corridor is a logistical route planned to pass through the Zengezur (Syunik) region in southern Armenia, aiming to directly connect western regions of Azerbaijan with the Nakhchivan Autonomous Republic. The implementation of the corridor came to the agenda within the framework of the Tripartite Declaration signed on 10 November 2020. This route holds strategic importance due to its potential to establish an uninterrupted land connection between Azerbaijan and TĂŒrkiye. On 8 August 2025,

EN
Duygu ƞahinler

Duygu ƞahinler

Alican Border Gate

Alican Border Gate

(1297 words)
June 30, 2026

Alican Border Gate is a strategic crossing point long closed between TĂŒrkiye and Armenia. While the primary reason for the closure was the Nagorno-Karabakh conflict, historical disputes have also contributed to its prolonged closure. However, since the beginning of a new normalization process after 2021, significant progress has been made in infrastructure upgrades and physical preparations have accelerated. Economic data indicate that opening the border could significantly boost regional develo

EN
Azra Karaca

Azra Karaca