
Ankara Havalimanı is located in the Etimesgut district, on the western bank of Ankara, the capital of Türkiye, bordering the districts of Sincan and Yenimahalle. It is one of the country’s most historically significant aviation facilities.【1】 The facility served as the primary and main airport for the capital until Esenboğa Havalimanı was constructed and fully operational in 1955. History According to archival documents and historical records, the area was known successively as Amaksyz, Amaksis,
EN
Azra Karaca

On July 10 2026 Türkiye and the Turkish Republic of Northern Cyprus (TRNC) signed the "Memorandum of Understanding on the Supply of Natural Gas to the TRNC". The agreement envisages the initiation of a technical legal and economic cooperation process aimed at delivering natural gas from Türkiye to the TRNC. The memorandum covers efforts to expand energy cooperation between the two countries and prepare for the development of the TRNC’s natural gas infrastructure. Scope of the Memorandum The memo
EN
Zeynep Gül

Darkhovin Nuclear Power Plant (also known as the IR-360 Reactor or the Karun Nuclear Power Reactor), is a nuclear power plant under construction in Khuzestan Province, on the banks of the Karun River and near the Iraqi border in southwestern Iran. The plant has been announced as Iran’s first nuclear power reactor designed and constructed using its own engineering capacity. The project has been a point of ongoing dispute between the International Atomic Energy Agency (IAEA) and Iran regarding saf
EN
Edanur Karakoç

Necip Uysal is a professional footballer born in Istanbul. He spent his entire career at Beşiktaş JK and is among the club’s longest-serving players. He played in the midfield position, having progressed through the club’s youth system and worked under various technical staffs at the senior level across different seasons, assuming multiple roles. Necip Uysal (AA)" image-alternate="" image-element-format="right"> Personal Information and Basic Profile Necip Uysal was born on 24 January 1991 in
EN
Burak Enes

Yusufeli Dam is a hydropower dam located on the Çoruh River in the Yusufeli district of Artvin, Türkiye. With a height of 275 metres from its foundation, it is the tallest dam in Türkiye and the fifth tallest double-curvature concrete arch dam in the world. Construction began in 2013 and reservoir filling commenced on 22 November 2022. The dam was implemented by Limak İnşaat and represents Türkiye’s national energy policy shift toward domestic and renewable energy sources. Technical Specificatio
EN
Rümeysa Gökçınar

Alican Border Gate is a strategic crossing point long closed between Türkiye and Armenia. While the primary reason for the closure was the Nagorno-Karabakh conflict, historical disputes have also contributed to its prolonged closure. However, since the beginning of a new normalization process after 2021, significant progress has been made in infrastructure upgrades and physical preparations have accelerated. Economic data indicate that opening the border could significantly boost regional develo
EN
Azra Karaca